communication facility maintenance
is no longer a choice, but a necessity.
now a legal requirement for buildings with a total floor area of 5,000㎡ or more.
Applicable Buildings and Grace Period
of buildings with a total floor area of 5,000㎡ or more.
step1
2025-07-19a total floor area of 30,000㎡ or more
step2
2026-07-19a total floor area of 15,000㎡ or more
step3
2027-07-19a total floor area of 5,000㎡ or more
| Category | Facility Type |
| Communication Facilities (8 types) |
Cable Facilities, Conduit (Piping) Facilities, Main Line Incoming Facilities, Terminal Box Facilities, In-building Mobile Communication Line Facilities, Telephone Facilities, Community Broadcasting Reception Antenna Facilities, Cable Television (CATV) In-building Transmission Line Facilities |
| Broadcasting Facilities (1 type) |
Broadcasting Audio Facilities |
| Information Facilities (23 types) |
Network Facilities, Electronic Access Control System, Remote Meter Reading System, Parking Control System, Parking Guidance System, Automated Parcel Locker System, Emergency Call (Panic Button) Facilities, Video Surveillance System, Home Network Facilities, Building Information System (BIS), Electric Clock System, Integrated SI System, Facility Management System (FMS), Building Energy Management System (BEMS), Intelligent People Counting System, Intelligent Perimeter Surveillance System, Smart Hospital Facilities, Smart Anti-Theft System, Smart Factory System, Smart Library System, Intelligent Anomalous Sound Detection System, IoT-based Underground Space Safety Management System, Digital Signage |
| Other Facilities (2 types) |
Telecommunication Power Supply Facilities, Telecommunication Grounding Facilities |
*Reference: Standards for the Maintenance and Management of Information and Communication Facilities (Effective July 18, 2025)
building owners take?
34 Facilities, Complex Technical Standards,
and Ongoing Regulatory Compliance
This is not possible without qualified professionals.
We assign qualified professional technicians and complete the required reporting to the relevant authorities within 30 days.
Systematic inspection of all information and communication facilities, including CCTV and broadcasting/telecommunication facilities, with comprehensive reports provided.
Accurate assessment of facility performance with detailed reports prepared.
One-stop support for facility repair and replacement based on inspection results.
Reason.01
Reason.02
Reason.03
Reason.04